Dreamer
Classified Forum Moderator
OK, so we've got a place, lots of people interested, a fair stackof gear lined up, and I'm sure we all have our favorite "demo tracks" already picked out...
So now, all we need is a date! Let's work on narrowing down the schedule. It's been my experience that for an event like this to come off smoothly, we need to have at least 3 weeks lead time, so that everyone can plan their schedules ahead.
It's looking like I'm going to be moving down to NC th efirst weekend in June. That weekend will, of coure, be completely out for me. I've got a LOT of stuff to move, so it will probably be a slow phase-in where I'll be making a few trips over the summer to get my stuff all out of storage in WV and trucked down to NC, but if I have enough notice, I'm TOTALLY in for this summer meet.
So let's try and nail down a date. This should be a GREAT meet!
--Richard
So now, all we need is a date! Let's work on narrowing down the schedule. It's been my experience that for an event like this to come off smoothly, we need to have at least 3 weeks lead time, so that everyone can plan their schedules ahead.
It's looking like I'm going to be moving down to NC th efirst weekend in June. That weekend will, of coure, be completely out for me. I've got a LOT of stuff to move, so it will probably be a slow phase-in where I'll be making a few trips over the summer to get my stuff all out of storage in WV and trucked down to NC, but if I have enough notice, I'm TOTALLY in for this summer meet.
So let's try and nail down a date. This should be a GREAT meet!
--Richard